Datapath Express9 Manual do Utilizador Página 10

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 15
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 9
10
09/03/2011
In order to complete the gen-locked link, you will need to connect the output of the S-Link
board in the downstream expansion chassis back into the next Image 4 graphics card in the
chain, as per the following image. Note again that the cable supplied with the S-Link board is
longer than those supplied with the Image4 graphics card in order to cover the extra distance.
Vista de página 9
1 2 ... 5 6 7 8 9 10 11 12 13 14 15

Comentários a estes Manuais

Sem comentários